High-Vacuum Simulations and Measurements on the SSR1 Cryomodule Beam-Line
Dec, 2015
3 pages
Contribution to:
- Published: Dec, 2015
Citations per year
Abstract: (JACoW)
In order to guarantee an effective cool-down process for the SSR1 cryomodule, a high-vacuum level must be achieved at room temperature in the beam-line before introducing gaseous and liquid helium. The SSR1 cavities in the beamline have a small beam aperture compared to the size of their internal volume. To avoid unnecessary complications for the vacuum piping of the cryomodule cold-mass, a pilot study was conducted on the string prior to processing and qualification of the components to investigate the vacuum level achievable by pumping only through the beam-line. To estimate the pressure distribution inside the cavity string we used a mathematical model implemented in a test-particle Monte-Carlo simulator for ultra-high-vacuum systems.- vacuum
- cavity
- cryomodule
- simulation
- niobium
References(0)
Figures(0)
Loading ...