The Superconducting Accelerator for the ESS Project
Jan, 2018
5 pages
Contribution to:
- Published: Jan, 2018
View in:
Citations per year
Abstract: (JACoW)
The European Spallation Source, ESS, is under construction in Lund since 2014. While the installation of the source and the normal conducting part will start in this autumn, the production and testing of cryomodules and cavities for the superconducting accelerator is in full swing at the partner laboratories. The spoke cavities and cryomodules will be provided by IPN Orsay and the testing of those modules will take place at Uppsala University. Prototyping and assembly of the elliptical cryomodules series is occurring at CEA Saclay, and the modules will be tested at a new test stand at ESS. The fabrication and test of the medium beta cavities is provided by INFN Milan and STFC Daresbury for the high beta cavities respectively. An overview of the current activities and test results will be presented in this talk.- ion
- cavity
- cryomodule
- SRF
- linac
References(23)
Figures(0)
- [1]
- [2]
- [3]
- [4]
- [5]
- [6]
- [7]
- [8]
- [9]
- [10]
- [11]
- [12]
- [13]
- [14]
- [15]
- [16]
- [17]
- [18]
- [19]
- [20]
- [21]
- [22]
- [23]