CEPC Input to the ESPP 2018 -Accelerator

Jan 10, 2019
12 pages
e-Print:

Citations per year

2019202020212022202301234567
Abstract: (arXiv)
In this manuscript, we provide a summary of accelerator design and the key challenges of the CEPC accelerator, both of which are laid out in detail in the Conceptual Design Report (CDR) released in November 2018. We also outline future directions and challenges. In the Addendum, we briefly describe the planning and the international organization of the CEPC. The next step for the CEPC team is to perform detailed technical design studies. Effective international collaboration would be crucial at this stage. This submission for consideration by the ESPP is part of our dedicated effort in seeking international collaboration and support.
Note:
  • arXiv admin note: substantial text overlap with arXiv:1809.00285
  • activity report
  • accelerator: design
  • electron positron: colliding beams
  • CEPC
  • accelerator: technology
  • costs