Mechanical System of the U26 Undulator Prototype for SHINE
Jun 3, 20243 pages
Published in:
- JACoW MEDSI2023 (2024) THPPP035
Contribution to:
- Published: Jun 3, 2024
Citations per year
0 Citations
Abstract: (JACOW)
The Shanghai High repetition rate XFEL and Extreme light facility (SHINE) is under construction and aims at generating X-rays between 0.4 and 25 keV with three FEL beamlines at repetition rates of up to 1 MHz[1-3]. The three undulator lines of the SHINE are referred to as the FEL-I, FEL-II, and FEL-III. Shanghai Synchrotron Radiation Facility(SSRF) will manufacture a total of 42 undulators (U26) with a period length of 26mm for FEL-I and 22 undulators (U55) with a period length of 55mm for FEL-II. Both the U26 and U55 are 4m long and use a common mechanical system. By using the specially designed double lever compensation springs can eliminate different magnetic force on the drive units. A U26 prototype has been developed and tested at SSRF. This paper describes the mechanical system design¿simulation and testing results of the U26 prototype, as well as its compatibility with U55.- FEL
- undulator
- SRF
- alignment
- linac
References(3)
Figures(0)
- [1]
- [2]
- [3]