Monthly report of activities: April 30, 1969

Apr 30, 1969
16 pages
Report number:
  • FERMILAB-NAL-024,
  • FERMILAB-MONTHLY-1969-004

Citations per year

0 Citations
  • [1]
    25-Foot Bubble Chamber. The first Brookhaven-NAL coordination meeting on the chamber was held at Brookhaven. It was decided as a design basis to fix the magnetic field at 40 kG, with a coil separation of 5 feet
    • [2]
      Model Superconducting Bending Magnet. The winding of the coil has been completed. The con has been tested to 950 A, the current required for 20 kG in the final configuration
      • [3]
        Superconducting Solenoid. The twisted-strand coil has been rewound with additional insulation, which removed the turn-to-turn shorts described here last month. The coil has been tested
        • [3]
          the critical current is independent of the charge rate over the range tested. The fastest charging rate -13NAL-24 0090.01 gave 10 kG in 0.3 sec, limited by the power supply. A new coil, with better insulation has been wound and is being tested