Mechanical Design Considerations for Sesame Main Subsystems
Jun, 20073 pages
Part of Particle accelerator. Proceedings, 22nd Conference, PAC'07, Albuquerque, USA, June 25-29, 2007, 263-265
Published in:
- IEEE Nucl.Sci.Symp.Conf.Rec.
Published in:
- Conf.Proc.C 070625 (2007) 263
Contribution to:
- Published: 2007
Report number:
- PAC07-MOPAN047
Citations per year
0 Citations
Abstract: (IEEE)
SESAME* will become the first 3 ^rd generation light source in the Middle East, located in Allan, Jordan. The main ring design has energy of 2.5 GeV, an emittance of 26 nm.rad and 12 straights for insertion devices. The conceptual design of the accelerator complex has been frozen and the detailed engineering design started. The SESAME building construction is in progress and the beneficial occupancy is expected by the end of 2007. In this paper we present some results which are relevant from a mechanical point of view to the design of the main ring subsystems.- accelerator magnets
- light sources
- particle beam injection
- storage rings
- 3rd generation light source
- SESAME main storage ring
- accelerator complex
- electron volt energy 2.5 GeV
- insertion devices
- main ring design
References(0)
Figures(0)
0 References