SPIRAL2 Accelerator Construction Progress
Apr, 20135 pages
Contribution to:
- Published: Apr, 2013
View in:
Citations per year
Abstract: (JACoW)
The SPIRAL2 superconducting accelerator installation starts in 2012. The major components have been tested in the various partner laboratories, and the building construction is well engaged. The management of the interfaces between process and buildings is a strategic point in an underground project with strong space constraints. This contribution will describe the performances of the various components of the SPIRAL2 accelerator, and the methodology put in place in order to insure the integration of the process inside the buildings.- linac